Fixing stage inspections in Cobbitty

Joinery, linings and the upstairs details checked before the painter starts.

  • Linings up, doors and joinery fitted, painter not yet in
  • 1 to 2 hours on site
  • Report within 24 hours
Request a quoteLeave your details and an inspector rings you back today.

No obligation. We use your details for your quote and may contact you about it even if you don't finish.

Fully licensed & accredited

Stage5 of 7
When to bookLinings up, doors and joinery fitted, painter not yet in
Time on site1 to 2 hours on site
Inspected againstAS 2589 (gypsum linings), AS 3958 (tiling), the Guide to Standards and Tolerances 2017 and your contract selections

What is included in a Cobbitty fixing inspection

  • Opening restriction on upstairs bedroom windows
  • Balcony drainage connected
  • Balcony posts fixed and certified
  • Door jambs and leaves installed
  • Architraves and skirtings complete
  • Window head and side infills
  • Damp course trimmed back
  • Service penetrations sealed
  • Downpipes fixed to the wall
  • Eaves lining level
  • Slab edges and garage junctions
  • Ground graded away from the house
Why it matters here

Fixing inspections on Cobbitty builds

Fixing is the stage where safety items on the upper floor show up in Cobbitty. Recent visits recorded first floor bedroom windows without the 125mm opening restriction, balcony drainage not yet installed and balcony posts that still needed an engineer's certification. On the ground floor the usual list followed: architraves and door jambs not fitted, window infills incomplete and a concrete slab finishing short of the garage wall.

What we find at this stage in Cobbitty

  • Upstairs windows without opening restriction
  • Balcony drainage not connected
  • Balcony posts awaiting certification
  • Architraves and door jambs missing
  • Slab short of the garage wall
Damp proof course left long and needing to be cut back, found during a fixing stage inspection in Cobbitty
Damp proof course left long and needing to be cut back
Sample findings

Sample defects found during our fixing inspections in Cobbitty

Annotated findings from Fixing inspections.

First floor bedroom window without a 125mm opening restriction, found during a fixing stage inspection in Cobbitty
First floor bedroom window without a 125mm opening restriction
Balcony posts incomplete and needing an engineer's certification, found during a fixing stage inspection in Cobbitty
Balcony posts incomplete and needing an engineer's certification
Balcony drainage not installed or connected, found during a fixing stage inspection in Cobbitty
Balcony drainage not installed or connected
Concrete slab stopping short of the garage wall, found during a fixing stage inspection in Cobbitty
Concrete slab stopping short of the garage wall

The other stages of a Cobbitty build

  1. Bored piers inspection in Cobbitty1Bored piersHoles drilled and cages in, concrete not yet ordered
  2. Slab pre-pour inspection in Cobbitty2Slab pre-pourSteel tied and plumbing through, the day before concrete
  3. Frame inspection in Cobbitty3FrameFrame standing and trusses fixed, before wrap and roof sheeting
  4. Lock-up (pre-plaster) inspection in Cobbitty4Lock-up (pre-plaster)Roof on, windows and external doors in, before any plasterboard
  5. Waterproofing inspection in Cobbitty6WaterproofingMembrane cured in the wet areas and on balconies, tiler not yet started
  6. Pre-handover (PCI) inspection in Cobbitty7Pre-handover (PCI)Build complete, a fortnight or so before the handover date

All construction stage inspections in Cobbitty →

Guides

Construction stage guides for Cobbitty

All guides →

Book a fixing inspection in Cobbitty

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Fixing inspections in Cobbitty: common questions

Why do upstairs bedroom windows need restriction?

To stop a child falling. The National Construction Code limits openings on first floor bedroom windows to 125mm where the fall height requires it.

Is that a builder item or something I fit later?

On a new build it is part of compliance and the builder should provide it before handover.

What do you check on balconies at fixing?

Drainage installed and connected, post fixings and anything the engineer must certify.

How long does the fixing visit take?

One to two hours, depending on how complete the house is.

What if the stage is not finished?

We record what was incomplete so you know what still needs checking at handover.

Do you check electrical fit off?

No. Exposed wiring or missing covers are noted only as safety observations for a licensed electrician to deal with.